On the job at...LEDNOCK DAM - Concrete Refurbishment


Click on the picture for a closer look.


Click on the picture for a closer look.

In Perthshire, Scotland the top 300mm of concrete of the Lednock dam was replaced using a Webster Schaeff TCU.

The project involved the removal of 169 cubic metres of concrete from the 225m long dam. Throughout the contract the WS 60 TCU averaged a cutting rate of 1.2 cubic metres per hour, including profiling operations.

The low levels of vibration produced were a major advantage, as the renovation work could not damage the remaining structure of the dam.

The accuracy of cut that is possible with a Webster Schaeff TCU makes it ideal for profiling, both vertically and horizontally on a concrete face, providing a good key for re-capping with new concrete.


 

 


 
   

Return to the PREVIOUS page. Updated: 10/20/2006

You are at: www.websterschaeff.com, the Web Site for Terex - Construction & Mining Technology. Our Address: Schaeff Str. 8, 74595 Langenburg, Germany. Tel: +49 79 05 / 58-0. Fax: +49 79 05 / 58-114. E-Mail: info@TEREX-Schaeff.com. Imprint.